基坑快速开挖对邻近高陡强风化岩边坡的稳定性影响
董理金,王华俊,库光依,姚文杰,齐昌广.基坑快速开挖对邻近高陡强风化岩边坡的稳定性影响[J].宁波大学学报(理工版),2026,39(3):54-64.DOI:10.20098/j.cnki.1001-5132.2025.1116
DONG Lijin,WANG Huajun,KU Guangyi,YAO Wenjie,QI Changguang.The influence of rapid foundation pit excavation on
the stability of adjacent high and steep strongly weathered rock slopes
[J].Journal of Ningbo University(Natural Science & Engineering Edition),2026,39(3):54-64.DOI:10.20098/j.cnki.1001-5132.2025.1116
| Title: | The influence of rapid foundation pit excavation on
the stability of adjacent high and steep strongly weathered rock slopes |
| 作者: | 董理金, 王华俊, 库光依, 姚文杰, 齐昌广 |
| Author(s): | DONG Lijin, WANG Huajun, KU Guangyi, YAO Wenjie, QI Changguang |
| 关键词: | 强风化岩; 快速开挖; 桩锚支护; 数值模拟; 变形机理 |
| Keywords: | strongly weathered rock; rapid excavation; pile-anchor support; numerical simulation; deformation mechanism |
| 分类号: | TU941 |
| DOI: | 10.20098/j.cnki.1001-5132.2025.1116 |
| 文献标识码: | A |
| 摘要: | 以宁波凰山岙强风化岩高陡边坡基坑工程为对象,采用现场监测、理论计算与ABAQUS数值模拟相结合的方法,研究快速开挖条件下桩锚支护体系的变形特征与主要影响因素。结果表明,快速开挖阶段为主要变形期,坑顶最大水平与垂直位移分别约为6.9mm和7.4mm;锚杆张拉后的位移速率下降超过90%,桩身呈上大下小的悬臂型变形模式;数值模拟与实测吻合良好(关键部位误差<10%),验证了修正摩尔–库伦模型的合理性;参数分析显示,适当增加桩长、减小桩距及增大锚杆倾角均可有效降低变形,其中桩长由10m增至16m可减少水平位移约30%。研究成果可为类似强风化岩边坡快速施工的支护设计提供参考。 |
| Abstract: | Taking the Huangshan’ao foundation pit project (Ningbo) as a research object, this study investigated the steep and strongly weathered rock slopes through field monitoring, theoretical analysis, and ABAQUS numerical simulation to evaluate their deformation characteristics under rapid excavation. Results show that the rapid excavation stage produced most of the deformation, with its maximum horizontal and vertical displacements being approximately 6.9 mm and 7.4 mm, respectively. Prestressed anchor installation reduced displacement rates by over 90%, and the anti-slide piles exhibited a cantilever-type deformation pattern. Numerical predictions agreed well with the monitored data (errors in key parts <10%), confirming the applicability of the modified Mohr-Coulomb model. Parametric analysis revealed that increasing pile embedment, reducing pile spacing, and enlarging anchor inclination can all effectively control displacement; increasing pile length from 10 m to 16 m could reduce horizontal displacement by about 30%. The findings provide guidance for supporting the design of rapidly excavated slopes in strongly weathered rock. |
| 参考文献 /References: | [1]. 超大型地下厂房立体多层面快速稳定开挖技术研究[J]. 四川水利, 2023, 44(2):50-53. [2].王乾坤, 朱科, 郭佩文. DEMATEL和模糊认知图在地铁深基坑施工安全风险动态评估中的应用[J]. 安全与环境学报, 2024, 24(11):4143-4153. [3].何晓, 王伟志, 徐永福, 等. 临近既有铁路增建新线地基处理施工影响比较分析[J]. 水文地质工程地质, 2024, 51(1):111-122. [4].王龙灿, 崔振东, 彭瑞东, 等. 含雁列式断续节理的岩质边坡失稳机制模拟研究[J]. 工程地质学报, 2024, 32(3):1069-1082. [5].WU J, YE S H, WANG Z Q, et al. Application and automatic monitoring and analysis of hybrid support structure in ultra-deep foundation pit engineering in the Lanzhou area under complex environmental conditions[J]. Water, 2023, 15(7):1335. [6].CHENG J H, GUO L L, WANG H, et al. Time-varying analysis of retaining structures enhanced with soil nails and prestressed anchors[J]. Buildings, 2022, 12(4):458. [7].PENG H, MENG B W, TAN S, et al. Study on deformation control of road-deep foundation pit passing under elevated subway bridge[J]. Applied sciences, 2024, 14(14):6357. [8].ZHANG W Y, YU S L, ZHANG X W, et al. Construction process simulation and in situ monitoring of dendritic structure on Nanjing Niushou Mountain[J]. Shock and vibration, 2019, 2019(1):1873479. [9].马昕, 孙德安, 刘树佳. 软土地区某超深圆形基坑变形特性及流固耦合分析[J]. 水文地质工程地质, 2024, 51(6):74-85. [10].张莎莎, 苏焰花, 樊林, 等. 基坑开挖对邻近既有盾构隧道的影响分析[J]. 建筑科学与工程学报, 2022, 39(1): 134-142. [11].李亮. 基于深基坑监测指标关联的安全综合评价方法研究[D]. 淮南: 安徽理工大学, 2024. [12].SUN G, LIU H, GUO Z Y, et al. A displacement- based theory for predicting the support force on the shield tunneling surface in sandy soil layers[J]. Advances in civil engineering, 2021, 2021(1):9980837. [13].ZHONG W C, HUANG N Y, NIE N, et al. Study on the influence of excavation of superlarge and ultra-deep foundation pits on the pile foundation of existing viaducts [J]. Advances in civil engineering, 2023, 2023(1):5834958. [14].JIANG Z J, ZHU S, QUE X C, et al. Deformation effects of deep foundation pit excavation on retaining structures and adjacent subway stations[J]. Buildings, 2024, 14(8): 2521. [15].LI M, XIANG P, SHEN H X, et al. Stability and distribution of rock slope under asymmetric excavation[J]. Applied sciences, 2024, 14(11):4384. [16].FAN H Y, LI L P, LIU H L, et al. Advanced stability analysis of the tunnels in jointed rock mass based on TSP and DEM[J]. KSCE journal of civil engineering, 2021, 25(4):1491-1503. [17].靳朋刘, 谢礼飞. 深圳地区入强风化岩后压浆灌注桩承载性状现场试验研究[J]. 建筑结构, 2022, 52(增刊1): 2699-2706. [18].贾及汉, 柳劲京, 李杰, 等. 强风化岩地区岩石锚杆基础抗拔承载力研究[J]. 武汉理工大学学报, 2024, 46(3): 93-98. [19].常志璐, 向晖, 余琦, 等. 耦合确定性与随机结构面的岩质边坡概率稳定性分析[J]. 地质科技通报, 2025, 44(2):2-13. [20].张御阳. 陡缓结构面反倾层状岩质斜坡变形破坏演化机制研究[D]. 成都: 成都理工大学, 2019. [21].王承恩, 辛红春, 张晓波. 船闸基坑开挖下边坡稳定性的数值模拟研究[J]. 中国水运, 2025(19):102-104. [22].刘潇, 董建辉, 唐成钱, 等. 成都大运会污水处理厂基坑开挖变形特征分析[J]. 成都大学学报(自然科学版), 2025, 44(2):218-224. |
| 备注/Memo: | 收稿日期:2025-11-21 宁波大学学报(理工版)网址:http://journallg.nbu.edu.cn/ 基金项目:浙江省自然科学基金(LY21E080007) 第一作者:董理金,高级工程师,主要研究方向为边坡工程。E-mail: 191727582@qq.com *通信作者:齐昌广,博士/副教授,主要研究方向为边坡工程。E-mail: qichangguang@nbu.edu.cn 宁波大学学报(理工版)网址:http://journallg.nbu.edu.cn/ |